A Tale of Four Wells

Four 8,000' wells were drilled in the same field by one Operator, using the same rig. Two wells were drilled utilizing a mud system without TORKease, encountering significant tight hole, stuck pipe, and other related hole problems.

TORKease was incorporated into Wells C and D, with significant improvements in drilling rate and hole conditions.

The addition of TORKease eliminated stuck drill pipe and fishing problems; increased penetration rate by as much as 35.9%; reduced rotating hours by as much as 35.4%; reduced rig time days by as much as 41.9%; significantly reduced overall well cost. Four subsequent wells have been drilled using TORKease, without sticking and with no loss of drilling time.

 

 

 
Well A
Drilling Fluid X
Well B
Drilling Fluid X
Well C
Drilling Fluid X
+ TORKease
Well D
Drilling Fluid X
+ TORKease
Rotating Hours
480
388.3
354
309.8
Number of Days
31
25
21.5
18
Drill Rate, ft/hr
14.75
18.28
20.05
22.79
Trouble Time, hrs
90.5
70
1.75
0
Trouble Cost @ $125/hr
$11,312.50
$8,750.00
$218.75
$0.00

 

Only TORKease remains stable and decreases torque in our geothermal slim-hole, diamond coring operations where existing formation temperatures
exceed 500°F 

-New Mexico

Without TORKease on location to provide lubrication for our high temperature geothermal exploration tests, we shut down! 

-Hawaii

If you improve TORKease any more, it will be so slick we won’t be able to keep it in the bucket!